
A lot of energy was spent today removing the rubble. One wheel barrow broke under the constant strain of the concrete loads, but nine continued on. There is still a small portion of rubble remaining, but it will be cleared out by tomorrow. The re-bar was untied and is now completely removed. Carlos along with Pastor Claude bought lumber and supplies to make the braces for the roof.
After lunch, two crews switched over to breaking rocks and sifting sand. These materials are being prepared for our concrete. This mixture will be used to pour new and repair the existing pillars for the roof.
Check out this video:
No comments:
Post a Comment